The Boat

The Boat

The Double Threat is a 43 Hatteras that was fully renovated in 2021 

It took nearly a decade to fulfill our vision of the "perfect" South Florida charter boat. We wanted to design something modern, tournament rigged, comfortable, durable, and economical. It's not easy to check all the boxes so we decided to restore a 43 Hatteras after much deliberation. We rebuilt this boat inside and out so we could have the perfect platform for our guests and crew. Check out a few pics and if you're interested, read more about the rebuild below!

Exterior

This boat was extensively refitted inside and out during the last 5 years. The boat has been repowered with Cummins 450 "Diamond Series" engines for increased reliability, speed, and efficiency. In addition, we have a brand new 8KW generator, air conditioning units, a custom fish box, livewell, and more. To top it off we installed a brand new tuna tower for a higher vantage point while sight fishing. 

Interior

During 2021 we embarked on an extensive refit of the interior. Our goal was to brighten it up so our boat is extra clean and comfortable which is easier said than done for a boat of this vintage. With new flooring, windows, countertops, fresh paint, and more, we made sure every inch of the interior is custom designed so you can enjoy your trip in comfort. 

Flybridge

With enough seating for 6 people, our flybridge offers a spacious vantage point for your party to enjoy the view during your trip. The bridge is equipped with a brand new hardtop for shade, fresh upholstery, cup holders, and more. We have all new electronics by Garmin, SMX, Simrad, JL Audio, Fusion, and more to help you find the fish and enjoy the ride while doing so.

Where it all started

When Double Threat Charters was founded, a 38 foot Chris Craft was the boat of choice for deep sea charters. Armed with Catepiller 3208’s, this convertible sportfish was definitely a workhorse but as a young captain, Nick viewed it as a stepping-stone toward his dreamboat. After chartering the Blue Yonder for about 5 years, Nick finally saved enough money for his dreamboat. This wasn’t going to come easy however. Nick had a vision of his ideal charter boat but unfortunately this wasn’t something money could buy. The ideal boat needed to be needed to be fully customized. In 2016, Nick set off on a journey looking around the country for the right boat to rebuild.

Chris Craft Sportfish

Where it all started on the "Blue Yonder"

Finished product after a long project

Building the Dream Boat

From beginning to end the entire process took about 2 years and Nick had to reinvest every penny he ever made. Most of the work was done by the Double Threat Charters crew. Subcontracting the entire project would have cost over half a million dollars if it were taken to the boatyard... The goal was to build the perfect boat for fishing in South Florida that was modern, tournament rigged, comfortable, durable, and economical. With careful consideration Nick decided the right boat would be a 43 Hatteras but he was looking for one that was already repowered. Finding a Hatteras from the 1970s that is still in good shape isn't an easy task. After looking all over Florida and even flying to Texas and New Jersey, he finally found the right boat. Located in Wildwood, New Jersey was his diamond in the rough. The boat was already repowered with Cummins 450c engines which is a modern 6 cylinder engine. In addition, part of the boat was rewired and the interior was in good shape. She seemed like a great boat to refurbish so Nick pulled the trigger. He bought a boat over 1,000 miles away that needed some work. He knew it would be a long year for the renovation.

Hull Choice- 43 Foot 1972 Hatteras

In the 1970s, fiberglass was just making it into the arsenal with mainstream boat builders. Engineers at the time didn’t fully understand the strength of this new material so they had a tendency to “overbuild” boats in the 70s. In the 80s and 90s, many boat builders would use “cored” hulls with closed cell foam in between fiberglass layers to save on cost, weight, and labor. They left behind a legacy of boats designed for durability so they could cater to the market of faster, more competitively priced boats.

Hatteras Yachts was an industry leader in production vessels during the 1970s. These American made boats were designed for the rough waters off North Carolina and their craftsmanship was unmatched by many boat builders at the time. Everything was overbuilt so it could suffer abuse from corrosion and rough seas. In addition, engineers at the time understood the importance of making parts accessible. Instead of cramming the largest components into the tightest spaces like modern production boats, Hatteras was always mechanic friendly.

A well-made fiberglass hull can last virtually forever. Because of the strength and timeless lines, Nick choose to go with a 1972 43 foot Hatteras as our boat of choice for commercial business. Unfortunately, the hull is just many parts of the bigger picture for a properly built boat. We decided to fully renovate our 1972 Hatteras so we could appreciate the best of both worlds. A strong hull with classic lines, modern engines, modern electronics, and a brand new tuna tower were the end goal of our project.

Engine Choice- Cummins 450C “Diamond Series”

The hull design of Hatteras during the early 70s was timeless but the engines were not. Armed with 2 stroke Detroit diesels, these boats were slow and inefficient. These older engines didn’t have the efficiency or durability of modern engines so many owners chose to repower these classic boats. The Double Threat was repowered with Cummins 450C “Diamond Series” engines. These are arguably the best engines at their horsepower rating of 450 hp. These are inline, 6 cylinder engines and can be rebuilt in frame. The result is a long lasting, compact, light engine that is both economical and easy to service. The long term cost of ownership on engines with this horsepower rating can’t be beat. 

The Voyage

Boy did this part suck. About a month after purchasing the boat we finally had a weather window to bring the boat down. The plan was to bring the boat down on the outside (not the Intercostal Waterway). We plotted the trip and figured it would take about a week running 24 hours a day. We would make 1 stop for fuel in the Carolinas. I put together a 3 person crew with myself included. We had decent weather until we got off Georgia. From Georgia to West Palm Beach (about a 2 day stretch) the seas were 6-8 foot. I had the night shift which was no fun at all. We finally got back to Miami but relieved wouldn't be the right word. I had an ambitious project ahead of me. Below is a picture of us coming into Government Cut after the 7 day trip.

Hatteras Coming Home

Coming into Government Cut after 7 days at sea

Work Work and more Work

I put together a to-do list that might have been a little too ambitious. By the time we finished the dream boat, we wanted nothing but the hull to be original. With a major overhaul in mind, we wanted to rewire the entire boat from the engine room to the flybridge. We chose to install all new led lighting throughout the boat from the underwater lights and the engine room to the tuna tower. The outcome was a modern look with all new lighting. In addition to new lighting, we decided to install brand new electronics on the flybridge and tuna tower. We went with SMX engine displays which combined the best of both worlds: modern mechanical engines with cutting edge display technology. These displays were networked via NMEA 2000 to a pair of Garmin 10 inch displays on the flybridge. These chart-plotter/fish-finders were the best money could buy and were paired with a GSD 26 and 3kw Chirp Transducer that was fiberglassed into the keel. In addition we have a 10 inch display in the tuna tower, a brand new fusion radio, 3 Icom radios, and JL Audio Speakers. We planned on painting the boat top to bottom, installing a tuna tower, fiberglassing a custom fish box and live-well. This was just scratching the surface... We spent the first few months stripping the boat and sanding her down in addition to glassing all the holes shut. It was definitely discouraging, for a while it seemed like the project was headed in the wrong direction. Luckily I only got electrocuted one time and before we knew it we had gutted the boat. For about 6 months, I didn't get to visualize much progress. Once we were done stripping the boat, new paint was definitely easy on the eyes.

Fiberglassing and Painting the Cockpit among other things

Painting the boat was a ton of work. We took 90% of the boat down to the fiberglass with our prep. This involved sanding through years of paint. When we finished it was worth it though.  A major project was fiberglassing the entire bulkhead which you can see below. The old bulkhead was wood but we sanded it down, dug out the dry rot, fiberglassed, and painted it. This took about a month of excruciating labor. 

We replaced all the rod holders on the boat, installed a custom livewell, a custom fishbox, and 4-pump pump box, and external livewell rigging. The cockpit was completed with a 10 rod leaning post by Pompanette as the centerpiece. Everything was plumbed, rewired, and rigged to optimize livewell space and fish box storage. We put all new rod holders into the teak gunnels and used fiberglass to reinforce them. We only started one chemical fire during this phase of the project and luckily we made it through unscathed. 

Fresh fiberglass work, paint, livewells, fish box, rocket launcher, and more

Tuna Tower Installation

One of the biggest aspects of the project was the fabrication, rigging, and installation of a full size tuna tower. This tower featured a 5 step gap, hard top, platform, and all new aluminum. A modern tuna tower helped make this project come together when it was completed with all new rigging. The major aluminum work was subcontracted but we were very hands on when it came to the design and installation. In addition we did all of the rigging in house.

Time Spent on the Hard

Once we painted the boat, rewired the bridge, and installed the tower, it was time to hit the yard. No expense was spared during this rebuild and no stone was left unturned. We started by redoing the alignment on the engines to minimize vibration. This makes for an unmatched ride that is both smooth and quiet. We redid the entire exhaust system with modern mufflers so the boat would be more quiet and reduce back pressure. In addition we installed all new steering lines, new transmission cables, throttle binnacles, and more. We painted the hull, installed the electronics and more during this phase of the project. We were on the hard for a few months. We also slapped on the boat name in the yard which was encouraging to see. Once we splashed the boat we finally got to the interior. With a little help from my fiancé we were able to find the right carpet, redo the couches, and print some of our favorite photos.

The Finishing Touches

It took over a year before she was finally ready. I'm proud to say I have my dream boat at the young age of 24. We think the new "Double Threat" came out pretty good. Over 1,000 charters later she is still running strong and catching fish.

Hatteras Coming Home